Difference between revisions of "2016 November"

From EOVSA Wiki
Jump to: navigation, search
(Nov 04)
(Nov 04)
Line 1: Line 1:
 
= Nov 04 =
 
= Nov 04 =
 
19:18 UT Reboot ROACHes to clear fault light and test whether large delays are still present.  They were power-cycled and reloaded.
 
19:18 UT Reboot ROACHes to clear fault light and test whether large delays are still present.  They were power-cycled and reloaded.
 +
19:24 UT Started roachcal.scd to take packet capture data for checking delays.

Revision as of 19:28, 4 November 2016

Nov 04

19:18 UT Reboot ROACHes to clear fault light and test whether large delays are still present. They were power-cycled and reloaded. 19:24 UT Started roachcal.scd to take packet capture data for checking delays.