2023 June
Jump to navigation
Jump to search
June 07
16:00 UT Calibrations did not run for June 6. The LNA voltages on the 27m were all zero. I rebooted the brick, initialized the LNA and homed the receiver.
June 08
17:30 UT Frequency Tuning had locked up. Trying to reboot did not work. The ACC VI could not be started. The Windows computer was rebooted, as was the ACC before observations were resumed. About 1 hour of observing time was lost.